34-ton tracked wash plant

Wash plant grizzly mounting repair

The grizzly mounts shake loose, hammer the bolts and let the grizzly box flop on the shaker.

  • 8 h
  • Expert
  • 8 steps
  • 11 tools
Grizzly box / shaker screen mounting joints on a 34-ton tracked wash plant

The whole job 8 steps

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.

Safety first

Shop or dealer job

Do these before step 1.

  • DANGERLock out: implements down, chocked, key out, isolator off, tag on.
  • DANGERSupport it: level ground, rated stands or cribbing, not a jack.
  • WARNINGHeavy part (23 kg+): lifting gear or two people, mind pinch points.
  • WARNINGHot work: clear combustibles; use fire watch and welding PPE.

Stop and call a pro or the dealer if

  • Stop and call the OEM or structural engineer for cracks, torn holes or distorted structure.

Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.

Tools

Tick what you have. In the app, Mechy ticks the ones it can see in your photos.

Parts and supplies

  • 1×Mounting fastener setOEM-approved bolts, washers and locking nuts; confirm fit and gradeCheck before you buy
  • 1×Welding consumablesOnly as specified by approved repair drawing and welding procedureCheck before you buy

Steps

  1. Step 1 of 8

    Isolate and support

    Lock out all drives; prove zero energy, chock tracks and crib both boxes independently.

    Relieve hydraulic pressure and restrain spring-loaded or gravity-driven movement.

    Lockout kit, Rated cribbing and chocks

  2. Step 2 of 8

    Approve the repair

    Have OEM or engineer approve rigid joints, material, weld procedure and fatigue details.

    Schematic only; verify dimensions and weld locations against approved drawings.

    Inspection kit

  3. Step 3 of 8

    Strip damaged hardware

    With loads supported, remove beaten fasteners without letting the grizzly shift.

    Wrenches, Rated lifting gear

  4. Step 4 of 8

    Inspect bare joints

    Clean mounts; inspect holes, weld toes and parent steel for cracks and fretting.

    Cracks or distorted mounts need an engineered repair before proceeding.

    Grinder, Inspection kit

  5. Step 5 of 8

    Restore and align

    Complete approved mount repairs; align and clamp the grizzly without preload or twist.

    Alignment tools, Rated lifting gear, Grinder

  6. Step 6 of 8

    Fit approved hardware

    Fit new hardware and tighten only as the approved joint design requires.

    Fastener installation: Check OEM manual and approved repair drawing for grade Check it against your manual.

    Wrenches, Torque wrench

  7. Step 7 of 8

    Weld approved joints

    A qualified welder welds the approved seams in sequence under the specified procedure.

    Protect electronics per OEM; place return clamp locally, never across bearings.

    Weld requirements: Verify weld size, length, filler, preheat and sequence on Check it against your manual.

    Welder, Welding PPE and screens, Fire extinguisher

  8. Step 8 of 8

    Inspect and commission

    Accept welds, restore guards, clear supports safely, then conduct an approved test run.

    Clear personnel before restart; lock out again before checking for movement.

    Inspection kit, Rated lifting gear

Stuck on this one? Snap your machine and ask Mechy. It redraws these steps for what you have in front of you. First guide free. No sign-up, no card.

Snap a photo, ask Mechy

Or open this job in Mechy and follow it in 3D.

First guide free. No sign-up, no card.

Snap a photo, ask Mechy