Mechy Try it

70-tonne-class excavator

Excavator carrier roller replacement

A failed carrier roller leaves the track unsupported and dragging, and the machine stays parked until it is replaced.

  • 4 h
  • Hard
  • 8 steps
  • 9 tools
Track carrier roller on a 70-tonne-class excavator

The whole job 8 steps

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.

Safety first

Specialist task: trained techs only

Do these before step 1.

  • DANGERLock out: implements down, chocked, key out, isolator off, tag on.
  • DANGERSupport it: level ground, rated stands or cribbing, not a jack.
  • DANGERRelieve pressure: engine off, cycle controls, bleed accumulators.
  • DANGERLeaks: never feel by hand. An injection injury needs the ER now.
  • DANGERTrack adjuster: relief valve 1 turn max, never stand in front of it.
  • WARNINGHeavy part (23 kg+): lifting gear or two people, mind pinch points.

Stop and call a pro or the dealer if

  • Call the dealer for cracked or bent mounts, damaged threads or uncertain roller compatibility.
  • Stop if unseen damage or an unverified lifting or adjuster procedure prevents safe work.

Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.

Tools

Tick what you have. In the app, Mechy ticks the ones it can see in your photos.

Parts and supplies

  • 1×Replacement carrier rollerUsed or sourced roller; verify fit, load rating and condition against OEMCheck before you buy
  • 4×Mounting boltsOEM-specified diameter, grade, length and locking methodCheck before you buy

Steps

  1. Step 1 of 8

    Isolate and secure

    Ground attachments; shut down, key out, isolate battery, tag controls and chock tracks.

    Lockout kit, Rated chocks and cribbing

  2. Step 2 of 8

    Unload the roller

    Release track tension by OEM procedure; lift and mechanically support the upper run.

    Never remove the grease fitting or work beneath an unsupported track.

    Track adjuster service tools, Rated track lifting gear, Rated chocks and cribbing

  3. Step 3 of 8

    Inspect mounting seat

    Clear failed remnants; clean the seat and check threads, cracks and track damage.

    Stop for damaged threads, bent mounts or structural cracking.

    Scraper and brush, Straightedge and measuring tools

  4. Step 4 of 8

    Verify replacement

    Confirm donor roller fit, free rotation, seal condition and mounting dimensions.

    Straightedge and measuring tools

  5. Step 5 of 8

    Fit roller assembly

    Hoist the complete roller onto its seat; align holes and start all bolts by hand.

    Keep hands clear; use the approved assembly lifting points.

    Hoist and slings, Socket and breaker bar

  6. Step 6 of 8

    Torque mounting bolts

    Tighten evenly with the specified thread condition; verify the roller turns freely.

    Mounting bolt torque: Check OEM manual for the identified machine and fitted Check it against your manual.

    Torque wrench

  7. Step 7 of 8

    Restore track tension

    Lower the run onto the roller, remove lifting gear and set sag by the OEM method.

    Track sag: Check OEM manual for measurement position and operating Check it against your manual.

    Rated track lifting gear, Track adjuster service tools, Straightedge and measuring tools

  8. Step 8 of 8

    Controlled track test

    Clear gear and people; de-isolate, creep forward/reverse, then re-lockout and inspect.

    Use a cleared level test area; nobody beside or beneath moving tracks.

    Lockout kit, Rated chocks and cribbing

Stuck on this one? Snap your machine and ask Mechy. It redraws these steps for what you have in front of you.

Snap a photo, ask Mechy

Or open this job in Mechy and follow it in 3D.

Snap a photo, ask Mechy