Skid-mounted diesel water pump
Diesel pump suction reducer repair
Cracked welds on the suction reducer let air into the intake line, and the pump loses prime.
- 4 h
- Hard
- 8 steps
- 12 tools

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.
Safety first
Shop or dealer jobDo these before step 1.
- DANGERLock out: implements down, chocked, key out, isolator off, tag on.
- WARNINGFuel: no sparks or smoking, catch every spill.
- DANGERMovement: chock skid and crib hoses before releasing joints.
- WARNINGHot work: weld off-machine; clear combustibles and post fire watch.
Stop and call a pro or the dealer if
- Call a qualified welder or dealer for unknown alloy, thin walls or cracks beyond the weld.
Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.
Tools
Tick what you have. In the app, Mechy ticks the ones it can see in your photos.
Parts and supplies
- 1×Intake flange gasketMatch flange, water service and suction duty; check OEM or part labelCheck before you buy
- 1×Welding consumablesMatch identified base metal and qualified repair procedureCheck before you buy
- 1×Replacement reducer if rejectedSuction-rated fitting matching pump and hose; verify OEM requirementsCheck before you buy
Steps
Step 1 of 8
Isolate and support
Stop engine, remove key, isolate battery, tag controls; chock skid and crib hoses.
Lockout kit, Chocks and rated cribbing
Step 2 of 8
Isolate and drain water
Isolate water sources, vent safely, then drain the pump and suction line.
Let hot water cool; verify zero pressure before opening joints.
Socket and wrench set, Drain pan
Step 3 of 8
Remove reducer assembly
Support hose, release clamps and flange bolts; bench the reducer clear of fuel.
Socket and wrench set, Hose support sling
Step 4 of 8
Expose and assess cracks
Identify metal; clean, map cracks with penetrant, then excavate to sound metal.
Remove penetrant fully before welding; reject thin or distorted steel.
Grinder and carbide burr, Dye penetrant kit
Step 5 of 8
Reweld off-machine
Use a qualified weld procedure, clamp earth to the fitting, and let it air-cool.
Qualified welder only; keep the fitting vented and never quench.
Welder, Welding PPE and screens, Fire extinguisher
Step 6 of 8
Inspect and vacuum-test
Inspect cooled welds with penetrant; clean, blank openings and vacuum-test.
Use retained, rated blanks; do not improvise a compressed-air test.
Vacuum and hold criteria: Use OEM or fitting supplier limits; check manual or part Check it against your manual.
Dye penetrant kit, Rated vacuum test kit
Step 7 of 8
Refit without strain
Fit a new gasket, reconnect hose and torque hardware; support the line independently.
Flange and clamp torque: Check OEM manual and clamp label for the installed hardware. Check it against your manual.
Socket and wrench set, Torque wrench, Hose support sling
Step 8 of 8
Prime and prove flow
Prime per OEM; clear crew, release lockout, start and verify stable water delivery.
Never run dry; stop for lost prime, leakage, cavitation or vibration.





